manual bilge pump
500~3000GPH DC 12V 24V Boat Bilge Pump
price

USD10.00 - USD50.00 / pieces

SF50102/SF50104/SF50105/SF50106/SF50107/SF50108
FOB
100 pieces
10000pieces / Month
Ningbo
Flow Rate:< 500GPH
Voltage:12V
Rated Current:11 - 15A
Certification:CE
Certification:ISO9001:2000
Certification:RoHS
Product Name:Bilge Pumps
Usage:Yacht
Quantity
  • Flow Rate:< 500GPH
  • Voltage:12V
  • Rated Current:11 - 15A
  • Certification:CE
  • Certification:ISO9001:2000
  • Certification:RoHS
  • Product Name:bilge pumps
  • Usage:Yacht
Product Description

500~3000GPH DC 12V 24V boat bilge pump

9CD523DB23E503C.jpg

DELIVERY VOLUME:500GPH
DELIVERY HEAD:4.5m
VOLTAGE DC:12V/24V
CURRENT:4A/2.5A
CABLE:1.2m
OUTLET DIA:19mm

Design features
Heavy duty motors with stainless steel shafts and tough thermoplastic bodies.
Totally submeersible and ignition protected
To all existing safety standardsBIA, NMMA and ISO/EC regulations
Water cooled motors for long life, with anti airlock design and moisture tight seals
Snap-lock strainer base for easy installation and removal, and silent vibration free running
No burn out if run dry

With silent, vibrationless operation. Plastic housing, stainless steel shafts, and rust/corrosion protection. Use in fresh water and saltwater only. Not self priming.
Nonautomatic bilge pumps
Require pump control switches

Specification

500.jpg1000.jpg1500.jpg2000.jpg2500.jpg3000.jpg

Our Services

1. Sample order


2. We will reply you for your inquiry in 24 hours.


3. After sending, we will track the products for you once every two days, until you get the products. When you got thegoods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offerthe solve way for you.

FAQ

Q1. What is your terms of packing?

A: Generally, we pack our goods in neutral boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. How about your delivery time?
A: Generally, it will take 30 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q4. Do you test all your goods before delivery?
A: Yes, we have 100% inspectation before delivery.

Q5. What is your terms of delivery?
A: FOB NINGBO